ŒUVRES DANS L’ESPACE PUBLIC (WORKS IN PUBLIC AREAS)

 

WORKS  IN PUBLIC AREAS

 

 

2006 / 2013

-Laureate of the CRM (Centre de Recherche sur la Méditerranée) contest

Boeri, Di Pol, Goetschy, Manfredi, Coeur, architects.

Construction of the Villa Méditerranée, urban scenography and design.

2002 /  2003 

-Laureate of the contest for the urban layout of the Place des Pistoles (Vieille Charité).

Project manager: Town of Marseille.

Collaboration: Pierre Barisain.

2000

-1% Artistic- Bronze, copper and stainless steel sculpture – Les Pelerins, dimensions : 20m x 10m x 8m.

Mont Saint Michel.

Project manager: Région Normandie.

1997

-Laureate of the contest for the layout of the gardens of the Hôtel du Département.

Square, formal gardens, urban furniture, fountain (collaboration with Manfredi).

Project manager: Conseil Général des Bouches du Rhône.

-Painted wall at La Major, Marseille, 250 M², project manger: OPAC.

1991 

-1% Artistic: Sculpture ‘The Dawn of Time’, Vitrolles.

Steel, bronze, mirror and vegetal – Dimensions : 10m x 4m x 2m.

Project manager: Conseil Général des Bouches-du-Rhône.

1990

-1% artistic: Sculpture ‘Identity’, engraved glass, 2m x 3m. Commissariat de Marseille.

Project manager: Roland Carta, Architect.

1987

-1% artistic: Sculpture ‘Homage to Hortense’, concrete, marble and bronze. Dimensions : 60 m².

Collège de Fond d’Aurumy, Fuveau , collaboration Bourry.

Project manager: Roland Carta, Architect.

Project manager: Conseil Général des Bouches-du-Rhône.

1986

-1% Artistic: Collège Lakanal, Archeology of the modest farm, Aubagne – Dimensions : 100 m² .

Collaboration Bourry.

Project manager: Conseil Général des Bouches-du-Rhône.

1982

-1% Artistic: bas-relief, enamelled lava. Project manager: Métro de Marseille.

1981

-Painted wall at La Réale – homage to Puget – Dimensions : 1000m²-collaboration : Bourry, Klemensievicz.

Project manager: Ville de Marseille.